ROLE
Construction of new units in module form and management of all activities to be carried out on the Girassol FPSO
LOCATION
Rosa field – Angola
DATE
2005/2007
CLIENT SPECIFICS
Rosa is located at 15km from the Girassol FPSO. It was the very first oil field of this size in deep waters to be linked to a FPSO.
Purpose: to enable Total, who operates the Girassol field at 150Km off the Angolan coast, to pump crude oil from a second underwater field (Rosa) from the same floating unit.
PONTICELLI’S CHALLENGES
It was the first time that we carried out such a large offshore project without stopping production.
Arrival in force in Angola
Ponticelli was in charge of all the works “above sea level”
SCOPE OF SERVICES
Scope:
- Fabrication, installation and integration of 6 modules on the FPSO.
- The new facilities were made up of 6 modules weighing a total of 6,000 t, 4 of which were built in France at Fos-sur-Mer, the other two were built in Angola.
KEY FIGURES
35
months of duration
3,000,000
man-hours
1,500
peak personnel
€430m
turnover