Rosa
![](https://www.ponticelli.com/wp-content/uploads/2007/01/Realisation_Rosa.jpg)
Client
Total E&P Angola
ROLE
Construction of new units in module form and management of all activities to be carried out on the Girassol FPSO
LOCATION
Rosa field – Angola
DATE
2005/2007
CLIENT SPECIFICS
Rosa is located at 15km from the Girassol FPSO. It was the very first oil field of this size in deep waters to be linked to a FPSO.
Purpose: to enable Total, who operates the Girassol field at 150Km off the Angolan coast, to pump crude oil from a second underwater field (Rosa) from the same floating unit.
PONTICELLI’S CHALLENGES
It was the first time that we carried out such a large offshore project without stopping production.
Arrival in force in Angola
Ponticelli was in charge of all the works “above sea level”
SCOPE OF SERVICES
Scope:
- Fabrication, installation and integration of 6 modules on the FPSO.
- The new facilities were made up of 6 modules weighing a total of 6,000 t, 4 of which were built in France at Fos-sur-Mer, the other two were built in Angola.
KEY FIGURES
35
months of duration
3,000,000
man-hours
1,500
peak personnel
€430m
turnover
Projects
![GMC OML100 Unity](https://www.ponticelli.com/wp-content/uploads/2018/01/Realisation_OML100-510x382.jpg)
![Optara Project](https://www.ponticelli.com/wp-content/uploads/2018/07/Realisation_Optara_01-510x382.jpg)
![SINCOR – CSH Project](https://www.ponticelli.com/wp-content/uploads/2002/01/Realisation_Projet_CSH__Sincor-510x382.jpg)
![Rosa](https://www.ponticelli.com/wp-content/uploads/2007/01/Realisation_Rosa-510x382.jpg)
![TIGF – Girland Project](https://www.ponticelli.com/wp-content/uploads/2018/08/Girland-510x382.jpg)
![OML 58 Upgrade](https://www.ponticelli.com/wp-content/uploads/2015/01/Realisation_OML58-upgrade-12-510x382.jpg)
![Project : Carbon capture and storage pilot project](https://www.ponticelli.com/wp-content/uploads/2018/08/Captage-CO2-510x382.jpg)
![Total Donges Refinery Maintenance](https://www.ponticelli.com/wp-content/uploads/2018/05/Realisation_Donges-510x382.jpg)
![CHEVRON – HHOB2 project](https://www.ponticelli.com/wp-content/uploads/2014/01/Réalisation_HHOB2_Chevron-510x382.jpg)
![MABRUK Field Maintenance Contract](https://www.ponticelli.com/wp-content/uploads/2002/01/Realisation_Mabruk-510x382.jpg)
![Antwerup Project](https://www.ponticelli.com/wp-content/uploads/2017/01/Realisation_Anwerup_LevageEPC2-510x382.jpg)
![MOHO 1 Bis](https://www.ponticelli.com/wp-content/uploads/2018/07/Realisation_Moho-510x382.jpg)
No Results Found
The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.
Your Ponticelli contact
![Philippe Braure](https://www.ponticelli.com/wp-content/uploads/2023/09/Philippe_Braure.jpg)
Philippe Braure
1 rue Lilienthal - Emerainville - BP 79
77312 Marne-la-Vallée Cedex 2
France
+33 (0)1 64 11 11 64
Contact-us