EPR Flamanville 3 –EM4 Package

EPR Flamanville 3 –EM4 Package Client AREVA – FRAMATOME ROLE Design, fabrication of erection of auxiliary piping on EPR reactor LOCATION France – Flamanville DATE 2008/2018 CLIENT SPECIFICS For the construction of its 1st “EPR” reactor, EDF and...

Hallencourt measurement tower

Hallencourt measurement tower Client OSTWIND ROLE Installation of an 85 m measurement tower LOCATION Condé-Folie (Somme, France) DATE February 2018 CLIENT SPECIFICS As part of the development of the future wind farm in Hallencourt, Ostwind called upon Ponticelli,...

Installation of wind turbines

Installation of wind turbines Client Enercon ROLE Lifting LOCATION Hardanges (Mayenne, France) DATE July – August 2017 CLIENT SPECIFICS Enercon, a manufacturer of world class wind turbines, wanted to install 4 wind turbines at Hardanges, in Mayenne. The turbines had a...

MOHO 1 Bis

MOHO 1 Bis Client Total E&P Congo ROLE Construction and installation works on the Alima FPU LOCATION Moho Bilondo field (the Congo) DATE 2013/2017 CLIENT SPECIFICS Total E&P Congo has been operating the Moho Bilondo oil field since 2005, with the FPU Alima...

Antares + Spica

Antares + Spica Client Providencia Solar ROLE GenSun ʺturnkeyʺ EPC in partnership with TSK LOCATION El Salvador DATE 2016/2017 CLIENT SPECIFICS Become the leading photovoltaic energy supplier in El Salvador 100’845’675Wp – 60MWA + 20 MWA PONTICELLI’S...