Replacement of EVC on the Beaumont Monteux dam

Replacement of EVC on the Beaumont Monteux dam Client EDF ROLE Co-contractor with the company ATB for the replacement of 6 spillway valves LOCATION Beaumont Monteux EDF dam – France (Dpt 26) DATE Works in progress CLIENT SPECIFICS The dam at Beaumont Monteux is...

Barracuda 1 to 4 – nuclear boiler room and conventional zones

Barracuda 1 to 4 – nuclear boiler room and conventional zones Client NAVAL GROUP ROLE Ponticelli is in charge of the assembly and installation of piping on the submarine in the nuclear boiler room and conventional zones, and is also participating in the preparation of...

Renovation of the penstock at Bens

Renovation of the penstock at Bens Client BATTAGLINO Project Management: HYDROSTADIUM Commissioned by: EDF ROLE Boiler works LOCATION EDF power plant at Bens – France (Dpt 73) DATE Project in progress CLIENT SPECIFICS The penstock at Bens was put into service in 1959....

Tank Opening/Closing

Tank Opening/Closing Client EDF ROLE A dedicated and specialised tank opening team to intervene during plant outages. LOCATION France – nuclear plants DATE In progress since 1987 CLIENT SPECIFICS The primary purpose of a nuclear plant outage is to proceed with the...

Replacement of drainage circuits on the Cheylas power plant

Replacement of drainage circuits on the Cheylas power plant Client EDF ROLE Contract holder for the replacement of piping LOCATION EDF power plant at Cheylas (Dpt 38) DATE Project in progress CLIENT SPECIFICS Each of the two reversible 240 mw generators are installed...