Ombineo power plants

Ombineo power plants Client CS Ombrineo ROLE GenSun ʺturnkeyʺ EPC LOCATION France DATE 2016 CLIENT SPECIFICS Roof-top power station at Ombrières PONTICELLI’S CHALLENGES Partially polluted site (hydrocarbons, asbestos etc…). Monitored active/reactive power management...

Dismantling of a wind turbine

Dismantling of a wind turbine Client Total (Sarens) ROLE Ponticelli was commissioned to dismantle a wind turbine LOCATION Total Flandres DATE January 2016 CLIENT SPECIFICS A Belgian group (Ecophos) took over the site of Total’s old refinery to produce dicalcium...

Visual impact studies – Saint Quentin

Visual impact studies – Saint Quentin Client Solvéo Energie ROLE GenWind (Ponticelli) in charge of visual impact studies LOCATION Saint-Quentin (02) DATE 2015 CLIENT SPECIFICS As part of impact studies, the wind energy developer must provide information to local...

OML 58 Upgrade

OML 58 Upgrade Client Total E&P Nigeria ROLE EPC Contract LOCATION OBAGI and OBITE facilities DATE 2010/2015 CLIENT SPECIFICS Capacity increase on gas production facilities This project enabled an increase in production from 2011 while respecting Nigeria’s federal...

Alpha solar power stations

Alpha solar power stations Client CS Alpha ROLE GenSun ʺturnkeyʺ EPC LOCATION France DATE 2015 CLIENT SPECIFICS Power station with a single axis PV tracker on support columns and a 2-axis CPV tracker on concrete blocks LES CHALLENGES À RELEVER From a technical point...