The Stade de France stands

 
Ponticelli has been entrusted with the changes to the configuration of the Stade de France since 1997. The methods implemented and the required equipment were specially developed by the Group for this occasion. A hydraulic gantry, which we specially adapted, is needed to move the stands back to allow the athletics track to appear.
 
In brief:
 
  • 500 tons stands to be moved over 15m
  • 32 slabs of 100 tons to be lowered
  • Length of time for the configuration change: 4 days

Actualités

  • Précédent
  • suivant
Centrale de Martigues

07 Juin 2010

Martigues Power plant ... Next

2010-04-19@Montereau

20 Avril 2010

Construction of two combustion ... Next

Blenod

12 Avril 2010

Auxiliary Piping Contract on t ... Next

lussagnet - epc4

17 Juillet 2009

EPC4 Lussagnet - End of constr ... Next

pps

01 Juillet 2009

PPS - Launch ... Next

logo pf 50

19 Juin 2009

Nomination of the 2009 Pf 50s ... Next

donges - dee

17 Avril 2009

DEE Donges - End of the shut-d ... Next

oml58

05 Mars 2009

Ponticelli awarded the OML 58 ... Next

combigolfe

15 Février 2009

Start of the Combigolfe constr ... Next

turbine vaires sur marne

10 Décembre 2008

Installing the 3rd Alstom turb ... Next

Toutes les actualités