Unit shut-downs

Ponticelli’s constant presence on many industrial sites, its experience in the fields of maintenance and construction, its strong emphasis on preparation and planning methods as well as its ability to mobilise a significant level of resources have made our company a major player in particular during unit shut-downs.

These short-term operations during which a considerable volume of work is carried out allow Ponticelli to exercise all of its skills.

In order to complete this type of work successfully, Ponticelli is able to implement and coordinate:

  • Qualified and experienced human resources
  • Appropriate modern equipment resources
  • Methods tested using the most powerful of tools

Vous devez disposer du lecteur flash pour lire cette animation

Actualités

  • Précédent
  • suivant
Centrale de Martigues

07 Juin 2010

Martigues Power plant ... Next

2010-04-19@Montereau

20 Avril 2010

Construction of two combustion ... Next

Blenod

12 Avril 2010

Auxiliary Piping Contract on t ... Next

lussagnet - epc4

17 Juillet 2009

EPC4 Lussagnet - End of constr ... Next

pps

01 Juillet 2009

PPS - Launch ... Next

logo pf 50

19 Juin 2009

Nomination of the 2009 Pf 50s ... Next

donges - dee

17 Avril 2009

DEE Donges - End of the shut-d ... Next

oml58

05 Mars 2009

Ponticelli awarded the OML 58 ... Next

combigolfe

15 Février 2009

Start of the Combigolfe constr ... Next

turbine vaires sur marne

10 Décembre 2008

Installing the 3rd Alstom turb ... Next