
15 Février 2009
Together with our local subsidiaries, EMIS and SMRI, the Construction Department is in charge of installing the shafts, gas and steam turbines for the Electrabel combined cycle power station, with 440MW installed power, on behalf of Alstom.
After the bad weather conditions at the beginning of the year, the pace of construction work has accelerated.

